Boiler Removal

Boiler Removal

Client: Royal Russell School
Project: Royal Russell School

Brief Description:

This project was a return visit to our long standing client Royal Russell School. We were awarded the contract to decommission and remove 2no. steel tube boilers from a live plant room.

Strip Out Works:

  • Installation of plywood to protect temp pipework and floor area
  • Strip boilers down of outer casing and lagging
  • Set up fume extraction
  • Hot cut the boilers into suitable size sections to remove from site
  • The experienced team carried out the dismantling and removal to a high standard with no complaints or damage.
  • All waste was safely and successfully removed from the site and all disposal paperwork was handed over to the client on completion