Client: Omega Building Services Limited
Project:
Falconbrook House, London

Brief Description:

We were awarded the project by longstanding client, Omega Building Services to remove 1no. 3,000ltr buffer vessel.

The vessel was located in a live boiler room and within close proximity to tenants, therefore great care needed to be taken to protect the live services and reduce any disruption.

Scope of Works

  • The team set up a restricted working area with clear signage to ensure the area was segregated from tenants
  • All live services were protected with sheeting
  • The vessel was cut into suitable size sections for removal from site utilising hot cutting methods and hand tools where required, keeping any noise to a minimum
  • The experienced team carried out the dismantling and removal to a high standard with no complaints or damage
  • All waste was safely and successfully removed from the site and all disposal paperwork was handed over to the client on completion