Demolition of Garage Canopy

Demolition of Garage Canopy

Client: Maris Interiors
Project: Chertsey

Brief Description:

KpH were awarded the project of dismantling a car showroom garage canopy on behalf of Maris Interiors LLP.

The team had to work to a tight programme, with two weeks to complete the project and hand back to the client.

Scope of Works:

This was a live site with Maris and other contractors working in the main building; the KpH team started works on site setting up barriers segregating the work area from the car park, with clear signage restricting the area to KpH employees.

Working off scissor lifts, KpH operatives used hand tools to carefully strip the sections close to the shop/building.

Utilising a rubber tracked 25 tonne excavator with rotator grab, the steels and purlins were carefully dismantled allowing them to be reduced via hot cutting methods. The dismantling had to be carefully planned at each section, to maintain the stability of the framework at all times. The KpH team have plenty of experience for these types of works and demonstrated that to our client throughout.

The experienced team carried out the dismantling and removal to a tight programme maintaining high standards of work and health and safety before being passed back to the client.