Fuel Tank Installation

Fuel Tank Installation

Client: Oakray
Project: Weston Primary School

Brief Description:

We were awarded the contract to build a new plinth and install a new 2,500ltr fire retardant bunded tank and install underground pipework to an existing oil tank, by our client Oakray.

Scope of Works:

  • Installed concrete blocks
  • Lintels laid to provide tank base
  • Fire Retardant Tank delivered using Hiab
  • 35m of new pipework installed including lever valve, solenoid valve, oil filter, tiger loop and sub meter
  • Transferred 1000ltr of gas oil from an existing tank into the new tank ready for commissioning