Hornsey Library, London

Oil Tank & Boiler Plant Removal

Client:  Engie
Project: Oil Tank & Boiler Plant Removal

Brief Description:

KpH Environmental was engaged by client Engie to provide a service for the Oil Tank & Boiler Plant removal at Hornsey Library, Haringey Park, London.

Scope of Works:

The experienced team fully trained in site management, confined space and hot works, controlled the works in a professional and safe working environment completing works within the timescale provided by the client.

Working in confined space conditions the onsite tank was cleaned, degassed and fragmented using hot cutting methods. The waste material was removed to a licenced facility with all waste tickets handed over to the client.

Cold cutting methods were utilised to break down the boilers into sections. The boiler sections were moved via mechanical stair climber and placed into the onsite skip. These works were made all the more challenging by the restricted working space of the plant room.

Following the safe removal of this heavy plant Operatives ensured that the site was clean, ready to be handed back over to the client.