Projects

  • Marylebone and Bishopsgate, London

    Brief Description: KpH Environmental were successful in the tendering of two projects to carry out the dismantling and removal of mechanical equipment and services across two data centres in London with our client ESG Plc. The project also involved the dismantling and removal of internal and external chilled water pipe work at Marylebone and removal of a 5-tonne diesel generator at Bishopsgate.

     

    Read more
  • Whitehall, London

    Brief Description: KpH have had a long-standing relationship with this client and his oil installation at Whitehall. Over many years KpH worked with the client to maintain and improve the installation to current legislation requirement’s and beyond.

    Read more
  • Ickford School, Buckinghamshire

    Brief Description: KpH was employed by Ickford school to carry out an investigation into a potential hydrocarbon oil spill beneath the school premises. KpH began by conducting an extensive investigation throughout the school which included opening up various floor spaces and drainage. The investigations confirmed that an oil spill had occurred, and a remediation plan was put for forward to remove the contaminated soils.

     

    Read more
  • Ford Motor Co., Thames Avenue Dagenham

    Brief Description: KpH carried out the cleaning of an open-air interceptor at Dagenham Ford for client Viridor. The works required a team off especially skilled operatives with confined space training to operate below ground level utilising a steam pressure washer to assist in removing thick waste.
    The interceptor had not been cleaned for 17 years therefore, operatives had to remove a substantial amount of waste. The weather conditions provided a minor setback, however KpH demonstrated effective versatility to work around the site conditions and complete the job.

    Read more