Tank Removal
-
Tank Clean & Removal
Brief Description:
Having carried out many successful projects with County Clean, KpH were awarded the project to clean and remove 2No. 4,000ltr basement oil storage tanks.
Whilst undertaking works, the team encountered heavy oil and the programme was adjusted accordingly.
-
Underground Tank Removal
Brief Description:
We were awarded the project by CBRE, to remove 1no 4,500ltr tank from a tank room at Tower Bridge, London.
Tower Bridge is a Grade I listed combined bascule and suspension bridge in London, built between 1886 and 1894.
-
Tank Clean & Removal
Brief Description:
We were awarded the project by CBRE, to remove 1no 4,500ltr tank from a tank room at Tower Bridge, London.
Tower Bridge is a Grade I listed combined bascule and suspension bridge in London, built between 1886 and 1894.
-
Underground Tank Removal / RG22 Foam Disposal
Brief Description: We were awarded the contract to open and degas 6no. redundant belowground tanks, these were a combination of foam and concrete slurry tanks. The site was tight and located on the corner of a busy road, with shared utilities across the boundary; the team had to be extremely methodical in cutting and removing the tanks.